Extra Money for Concrete Denied

Contractor claimed that the City contract restricted it to purchasing concrete from a single concrete supplier. In April 2014, Perfetto Contracting Co., an electrical contractor, successfully submitted a bid to the Department of Design and Construction for a contract to work on the Broadway Junction Transit Hub Enhancement Project. The contract required specific concrete designs to be procured from a NYSDOT-approved vendor. Perfetto began work in October 2014.


Owner of SRO Denied Certificate

Owner of Manhattan brownstone sought to convert a single room occupancy building. Nicole and Clinton Simpson own a single non-occupancy building located at 107 West 122nd Street in Manhattan. The Simpsons purchased the building in September 2016 from the prior owner, who had owned the building from 2007-2016. The Simpsons applied to the Department of Housing Preservation and Development for a certificate of no harassment, a requirement which must be satisfied before the owner … <Read More>


Claim based on verbal request denied

Construction Company sought additional compensation related to the reconstruction of Washington Square Park. In May 2015, the Parks Department contracted with SH5 Construction Corp. to reconstruct perimeter sidewalks around Washington Square Park, Manhattan. SH5 alleged a Parks employee gave it verbal instructions to install a straight curb instead of a drop curb at the north side of the park between 5th Avenue and University Place.


Balcony Ruled Not Part of Loft

Loft tenant counted terrace/balcony to reach statutory minimum of 400 square feet. David Coventry rented unit 1109 of a loft building located at 475 Kent Avenue, Brooklyn. Coventry applied for coverage and protection under the Loft Law. The owner of 475 Kent Avenue opposed, arguing that unit 1109 measured less 400 square feet, the minimum size required to be covered by the Loft Law. Coventry responded that unit 1109 would meet the 400 square foot … <Read More>


Extra Payment for Repair Work Denied

Contractor sought compensation for repairing damages caused during an additional work contract. In 2009, Sanitation entered into a $161 million contract with Prismatic Development Corporation to improve the North Shore Marine Transfer Station in Queens.  Prismatic, following Sanitation’s plans and specifications, installed a new deck and concrete overlay on the Transfer Station’s exterior ramp.  The concrete overlay later developed extensive cracking.  Sanitation conceded that an error in the design documents provided by Sanitation to Prismatic … <Read More>


Loft Tenant Wins Parking Space

New owner of a Brooklyn loft building demanded that resident vacate his parking space. Andrew Ohanesian, an artist, is the tenant of loft Unit 709, located at 475 Kent Avenue, Brooklyn.  Ohanesian signed a one-year lease with the building’s prior owner in February 2009 and has lived in the building ever since.  The prior owner verbally agreed that Ohanesian could use a designated parking space in the loading bay area of the building for an … <Read More>